Category Archives: Maya

All Blogs Time line for user Maya

W12_MY_Overhaul or Install New Deep Well


 I.      PROBLEM DEFINITION The case almost same with the last blog which is the deep well need to renew the pump. In this blog, we have the problem with the deep well itself. As report from owner area, capacities of … Continue reading

Posted in Maya | 1 Comment

W11_MY_Deepwell and Pump Efficiency


I.      PROBLEM DEFINITION For housing company water consumption, our company should have at least 4 pump ready at the time with 1500 liters/minutes/deep well as government regulation for output maximum for each deep well. Current condition, one of the pumps … Continue reading

Posted in Maya | 1 Comment

W10_MY_Breakeven Analysis


 I.      PROBLEM DEFINITION As last blog, we decide to purchase Toyota Fortuner 2.7 A/V with have 7 space passengers, 450 L Baggage Volume and minimum wheelbase dimension 2750 mm.  To purchase Toyota Fortuner 2.7 A/V is Rp 498.500.000 Which one … Continue reading

Posted in Maya | 1 Comment

W9_MY_Compensatory Model and Noncompensatory Model


 I.      PROBLEM DEFINITION Our family will be happy with new baby born in July 2013. I and my husband have a plan to upgrade our car by purchase the new one for our lovely family which has at least for … Continue reading

Posted in Maya | 1 Comment

W8_MY_Depreciation Value of Crane


PROBLEM DEFINITION Some job at maintenance execution need supported by crane equipment and special over time during shutdown which should be finish faster and need quick action support. For routine maintenance exclude shutdown job already served by 2 unit 100T … Continue reading

Posted in Maya | 1 Comment

W7_MY_Different Useful Life of Crane


PROBLEM DEFINITION Some job at maintenance execution need supported by crane equipment and special over time during shutdown which should be finish faster and need quick action support. For routine maintenance exclude shutdown job already served by 2 unit 100T … Continue reading

Posted in Maya | 2 Comments

W6_MY_Alternative Review of Crane


I. PROBLEM DEFINITION Some job at maintenance execution need supported by crane equipment and special over time during shutdown which should be finish faster and need quick action support. For routine maintenance exclude shutdown job already served by 2 unit … Continue reading

Posted in Maya | 4 Comments